# originalEstimate in JQL: field syntax and examples

URL: https://goingstellar.ro/reference/jql/originalestimate-field/

The originalEstimate field holds the time someone expected a work item to take. You compare it with a duration written with w, d, h and m. Use it to find unestimated work before planning and to spot items that are too big for one sprint. Alias: `timeOriginalEstimate`.

## Syntax

```
originalEstimate > 2d
originalEstimate = "1d 2h"
originalEstimate is EMPTY
```

## Works with

- Field type: DURATION, no auto-complete. Only available if time tracking has been enabled by your Jira administrator
- Operators: =, !=, >, >=, <, <=, IS, IS NOT, IN, NOT IN
- Functions: none
- Not with: ~, !~, WAS, WAS IN, WAS NOT, WAS NOT IN, CHANGED

## Examples

```
originalEstimate > 2d
```

Work estimated at more than two days. The usual first pass when you look for items to split. Run on Jira Cloud on 2026-11-29.

```
originalEstimate is EMPTY AND status = "To Do" AND project = WEB ORDER BY created ASC
```

Ready-to-start work that nobody estimated yet, oldest first. Bring it to the next refinement session. Run on Jira Cloud on 2026-11-29.

```
originalEstimate >= 1w AND statusCategory != Done
```

Open work estimated at a week or more, for a check on whether it should be broken down. Run on Jira Cloud on 2026-11-29.

```
originalEstimate = "1d 2h"
```

An exact estimate written as a combined duration. Quote it because it contains a space. Run on Jira Cloud on 2026-11-29.

```
originalEstimate < 4h AND sprint in futureSprints()
```

Small items already placed in a future sprint, handy when you look for quick wins to pull forward. Run on Jira Cloud on 2026-11-29.

```
timeOriginalEstimate > 1d
```

The same field through its alias, if that is the name you already use in older filters. Run on Jira Cloud on 2026-11-29.

## Pitfalls

- Estimates must be positive durations. `originalEstimate = 1x` returns "The value '1x' for field 'originalEstimate' is invalid. Please specify a positive duration format; for example: '1h 30m', '2d'." A negative offset such as `"-1d"` gets the same error, because this is not a date field (checked on Jira Cloud, November 2026).
- Always write the unit. The docs list w, d, h and m, and a bare number tells the reader nothing even where the parser accepts it. Quote values that contain a space, as in `"1d 2h"`.
- To list work with no estimate, use `originalEstimate is EMPTY`. Comparisons such as `originalEstimate < 4h` are written against a value, so do not use them for that.
- The field exists only when your administrator enabled time tracking. `~` is rejected: "The operator '~' is not supported by the 'originalEstimate' field."

## Questions and answers

### How do I find work items with no estimate in JQL?

Use originalEstimate is EMPTY and narrow it with a status or project clause.

## Related

- [timeSpent](https://goingstellar.ro/reference/jql/timespent-field/)
- [EMPTY](https://goingstellar.ro/reference/jql/empty-keyword/)
- [Greater than (>)](https://goingstellar.ro/reference/jql/greater-than-operator/)
- [Less than (<)](https://goingstellar.ro/reference/jql/less-than-operator/)
- [sprint](https://goingstellar.ro/reference/jql/sprint-field/)
- [status](https://goingstellar.ro/reference/jql/status-field/)

## Sources

- [JQL fields (Atlassian Support, Jira Cloud)](https://support.atlassian.com/jira-software-cloud/docs/jql-fields/)