# futureSprints() in JQL: syntax and examples

URL: https://goingstellar.ro/reference/jql/futuresprints/

futureSprints() stands for every sprint that has been created but not started yet. Use it with the sprint field to check what is already planned, find gaps in upcoming sprints, or prepare a planning meeting.

## Syntax

```
f
u
t
u
r
e
S
p
r
i
n
t
s
(
)
```

## Works with

- Fields: Sprint
- Operators: IN, NOT IN
- Not with: =, !=, ~, !~, >, >=, <, <=, IS, IS NOT, WAS, WAS IN, WAS NOT, WAS NOT IN, CHANGED

## Examples

```
sprint in futureSprints()
```

All work that is already assigned to an upcoming sprint. The base list for a planning review. Run on Jira Cloud on 2026-11-29.

```
project = SCRUM AND sprint in futureSprints() ORDER BY rank ASC
```

The planned work of one team in backlog order, so the top of the list is what comes first. Run on Jira Cloud on 2026-11-29.

```
sprint in futureSprints() AND assignee is EMPTY
```

Planned work that nobody owns yet. Run it before the sprint starts, because anything on this list is a commitment without a person. Run on Jira Cloud on 2026-11-29.

```
sprint in futureSprints() AND sprint not in openSprints() AND priority = High
```

High-priority work planned for later sprints only. It excludes work that is also in a running sprint. Run on Jira Cloud on 2026-11-29.

```
sprint in (futureSprints(), openSprints())
```

Everything that is planned or in progress, joined in one list. Past sprints stay out of it. Run on Jira Cloud on 2026-11-29.

```
project in (WEB, MOB) AND sprint is EMPTY AND statusCategory != Done
```

The opposite check: open work in two projects that is not in any sprint, and so still needs a planning decision. Run on Jira Cloud on 2026-11-29.

## Pitfalls

- Only `IN` and `NOT IN` are accepted. `sprint ~ futureSprints()` fails with "Operator '~' does not support the list value 'futureSprints()' for field 'sprint'" (checked on Jira Cloud, November 2026), and the equals sign gives the same kind of error.
- A sprint that has been started is no longer a future sprint. Work in a sprint that is running right now needs `openSprints()`.
- The Atlassian docs note that work can be in a completed sprint and an unstarted one at once. Carried-over work therefore appears in `sprint in futureSprints()` as well as in the closed-sprint history.
- `sprint not in futureSprints()` skips work with no sprint at all, so it is not a way to find work outside the plan. Use `sprint is EMPTY` for that.

## Ready-made queries

- [Planned for a future sprint](https://goingstellar.ro/tools/jql-examples/#next-sprint)

## Questions and answers

### How do I list the work in upcoming sprints in Jira?

Use sprint in futureSprints(). Combine it with assignee is EMPTY to find planned work without an owner.

## Related

- [openSprints()](https://goingstellar.ro/reference/jql/opensprints/)
- [closedSprints()](https://goingstellar.ro/reference/jql/closedsprints/)
- [sprint](https://goingstellar.ro/reference/jql/sprint-field/)
- [IN](https://goingstellar.ro/reference/jql/in-operator/)
- [NOT IN](https://goingstellar.ro/reference/jql/not-in-operator/)
- [IS](https://goingstellar.ro/reference/jql/is-operator/)

## Sources

- [JQL functions (Atlassian Support, Jira Cloud)](https://support.atlassian.com/jira-software-cloud/docs/jql-functions/)
- [JQL fields (Atlassian Support, Jira Cloud)](https://support.atlassian.com/jira-software-cloud/docs/jql-fields/)

