# endOfYear() in CQL: syntax and examples for Confluence

URL: https://goingstellar.ro/reference/cql/endofyear/

endOfYear() closes the current year. With "-1y" or "-2y" it names the end of an earlier year, so you can ask for content last touched before a given year was over. That makes it the natural cut for an annual archive review.

## Syntax

```
endOfYear()
endOfYear("inc")
```

## Arguments

- `inc` (optional: no): Optional offset in the form (+/-)nn(y|M|w|d|h|m): y year, M month, w week, d day, h hour, m minute. Quoted. With no sign, plus is assumed. The unit is required and case sensitive, and the offset moves the boundary.

## Works with

- Fields: created, lastmodified
- Operators: =, !=, >, >=, <, <=
- Not with: ~, !~, IN, NOT IN (checked on Confluence Cloud, November 2026: `created ~ endOfYear()` is rejected)

## Examples

```
created < endOfYear()
```

Content created by the end of this year. This is the documentation example. Run on Confluence Cloud on 2026-11-29.

```
lastmodified < endOfYear("-1y") AND type = page ORDER BY lastmodified ASC
```

Pages not edited since last year ended, oldest first, as the working list for a yearly cleanup. Run on Confluence Cloud on 2026-11-29.

```
lastmodified <= endOfYear("-2y")
```

Anything untouched since the end of the year before last. A stricter cut when the first list is too long. Run on Confluence Cloud on 2026-11-29.

```
created > endOfYear("-1y") AND created <= endOfYear() AND space = SD
```

Everything created in one space during the current year, for a year-end count. Run on Confluence Cloud on 2026-11-29.

```
lastmodified < endOfYear("-1y") AND type = attachment
```

Attachments last modified before last year ended, as a starting point for a file storage review. Run on Confluence Cloud on 2026-11-29.

## Pitfalls

- The year ends at the start of the next one. On the Confluence Cloud site checked in November 2026, `endOfYear()` resolved to 00:00 on 1 January 2027, and `endOfYear("-1y")` to 00:00 on 1 January 2026.
- The offset is relative to today, so `endOfYear("-1y")` means the end of last year only until the calendar turns. Re-read it when you copy a saved query into next year's checklist.
- The year unit is lower case. `endOfYear("-1Y")` is not a valid unit and fails with HTTP 500 "IllegalArgumentException executing cql".
- A page on this list is stale by edit date only. People may still read it every week, so check views or ownership before archiving.

## Related

- [startOfYear()](https://goingstellar.ro/reference/cql/startofyear/)
- [endOfMonth()](https://goingstellar.ro/reference/cql/endofmonth/)
- [endOfDay()](https://goingstellar.ro/reference/cql/endofday/)
- [lastmodified](https://goingstellar.ro/reference/cql/lastmodified-field/)
- [created](https://goingstellar.ro/reference/cql/created-field/)
- [type](https://goingstellar.ro/reference/cql/type-field/)

## Sources

- [CQL functions (Atlassian Developer, Confluence Cloud)](https://developer.atlassian.com/cloud/confluence/cql-functions/)

